Lithium Power International

Drilling At Greenbushes Lithium Project

Lithium Power International Limited (ASX: LPI) (“LPI” or the “Company”) is pleased to announce that the Company has successfully completed its reverse circulation (“RC”) drilling stage at its East Kirup lithium prospect on E70/4763. Ten holes for a total of 573 metres of drilling were completed along existing tracks. A total of 960m was planned, however a few holes had to be cancelled due to environmental considerations. The majority of the holes were completed to 54m. All holes have been rehabilitated.


HIGHLIGHTS

  • LPI has successfully completed the RC drilling component of its inaugural drilling program at its East Kirup lithium prospect in the Greenbushes region of Western Australia
  • Ten holes were drilled for a total of 573 metres
  • Several two-metre zones have indicated the potential for pegmatites, after early drilling intercepted quartz, pink potassic feldspar, biotite and tourmaline
  • Samples have been submitted to an assay laboratory for analysis
  • Drilling has demonstrated that the depth of the laterite is only 5-7m, the ground water is non-saline and has very low total dissolved solids.
  • The drilling has successfully confirmed the presence of a number of shear zones thought to be controlling structures for pegmatite emplacement
  • The diamond drilling campaign commenced on 13 January 2023 and is expected to finish this week having drilled 4 holes for 400 metres
Several two-metre zones of quartz, pink potassic feldspar, biotite and tourmaline were intercepted. As these were within the overall package of gneiss and granofels, they are potentially pegmatites.

The East Kirup Prospect has demonstrated lithium anomalism in the soil, with results up to 232 ppm lithium (GS10448) near GBRC001, and has the same metamorphic grade and rock types as the host rocks at Talison’s Greenbushes mine.

The program was completed by Castle Drilling, which specialises in accessing difficult terrain with minimal environmental impact. The company utilised a small self-contained drill rig that did not require support vehicles. The rig carried nine rods on a carousel, which removed the need for rod handling. It was also fitted with a dust extraction device, which generated minimal dust both good for the environment and for the health of the workers.

The average daily drilling was at 58m due to the care needed to be taken navigating the narrow forest tracks, thereby avoiding damaging trees or the need to prune them. As much time and effort was spent in accessing the holes as was spent drilling.

Our exploration team was also very conscious of the ground water, and drilling was conducted in a manner that limited the amount of water reaching the surface, where only two holes required storage sumps. The ground water quality was very good with very low total dissolved solids.

The RC drilling component is being followed by 400m of HQ core-sized diamond drilling, which commenced on 13 January and is expected to be completed by the end of January.

The East Kirup prospect is located 20km north-west from the Greenbushes Lithium Mine along the Donnybrook Shear Zone, which hosts the lithium-bearing pegmatites at the Greenbushes Mine.

The exploration at E70/4763 is ongoing. A mapping and sampling program will commence next week at the Thomas A Prospect, which is an area of arsenic anomalism, which is a proxy for lithium in the Greenbushes region and is where historically pegmatites and surface kaolinite have been mapped.


Click here for the full ASX Release

This article includes content from Lithium Power International, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

LPI:AU
The Conversation (0)
Lithium Power International

Appendix 5B Cash Flow Report June 2023

Lithium Power International Limited (ASX:LPI) (“LPI” or “the Company”) has released its Quarterly Cash Flow Report.


Click here for the full ASX Release

Keep reading...Show less
White Cliff Minerals

Replacement Ann - Federal Licences Granted at Radium Point

Drilling Completed at Reedy South Project

White Cliff Minerals Limited (“the Company”) (ASX: WCN) is pleased to provide an update on its Radium Point Uranium-Copper-Gold-Silver Project and Reedy South Gold Project.

Keep reading...Show less
White Cliff Minerals

Federal Licences Granted at Radium Point U-Co-Ag Project

Drilling Completed at Reedy South Project

White Cliff Minerals Limited (“the Company”) (ASX: WCN) is pleased to provide an update on its Radium Point Uranium-Copper-Gold-Silver Project and Reedy South Gold Project.

Keep reading...Show less
Dog-Leg Delivers Further High-Grade Intersections Resource Extension Drilling Results Ewoyaa Lithium Project, Ghana, West Africa

Dog-Leg Delivers Further High-Grade Intersections Resource Extension Drilling Results Ewoyaa Lithium Project, Ghana, West Africa

27m at 1.85% Li2O from 126m returned at Dog-Leg target, outside of current MRE1

Atlantic Lithium Limited (AIM: ALL, ASX: A11, OTCQX: ALLIF, “Atlantic Lithium” or the “Company”), the African-focused lithium exploration and development company targeting to deliver Ghana’s first lithium mine, is pleased to announce further broad and high-grade assay results from resource drilling completed at the Company’s flagship Ewoyaa Lithium Project (“Ewoyaa” or the “Project”) in Ghana, West Africa.

Keep reading...Show less
Premier1 Lithium

Highly Experienced Lithium Professional Appointed as Managing Director

Premier1 Lithium Limited (ASX:PLC) (“Premier1” or the “Company”) is pleased to announce the appointment of Mr Jason Froud as Managing Director effective 1 June 2024. This appointment following an extensive executive search process marks an important milestone in the transition of Premier1 into a significant junior lithium explorer.

Keep reading...Show less
  Mandrake Resources

Next Generation DLE Provider Electralith Produces 99.9% Pure Battery-Grade Lithium Hydroxide from Mandrake Brine

Mandrake Resources Limited (ASX: MAN) (Mandrake or the Company) advises that next- generation Direct Lithium Extraction (DLE) and Refining provider ElectraLith Pty Ltd (ElectraLith) has produced 99.9% pure battery grade Lithium Hydroxide directly from Mandrake’s 100%-owned flagship 93,755 acre (~379km2) Utah Lithium Project brines.

Keep reading...Show less

Latest Press Releases

Related News

×