Equipment purchase reduces overall capex and fast tracks production at the New York Battery Plant

Magnis Energy Technologies Limited (ASX: MNS) has acquired state-of-the-art machinery that allows iM3NY to produce lithium-ion batteries for all major markets

  • Machinery acquired from lithium-ion cell manufacturer A123 Systems and is being relocated from Michigan to Huron Campus
  • iM3NY now has the ability to produce 20 and 50amp hour cells to cover all major markets for lithium-ion batteries
  • First production on track for late 2021

Magnis Energy Technologies Limited (ASX: MNS) is pleased to announce that Imperium3 New York (iM3NY) has acquired state-of-the-art machinery from lithium-ion cell manufacturer A123 Systems to reduce overall capex requirements while bringing forward production. Magnis has a direct and indirect holding of approximately 58% of iM3NY.

The new equipment includes formation lines, slurry making, coating, stacking machines, solvent recovery, and refining. The machinery will form part of a full assembly line enabling the company to further advance its technology while also expanding its production capabilities.

The purchase will enable iM3NY to further evolve its position as one of the new major players lithium-ion battery industry in the United States and internationally, as the industry continues growing exponentially and demand for products powered by lithium-ion batteries skyrockets.

The equipment was purchased from A123 Systems of Romulus, Michigan, and once installed at iM3NY’s Endicott facility, will function as its own production line. This line will allow for further cell development as well as the capacity to create samples and prototypes for existing and prospective customers.

Once fully operational, the new line will also support small-volume production for customers and gives the New York battery plant the ability to produce 20 and 50amp hour cells. This allows iM3NY to produce lithium-ion batteries for all major markets including Electric Vehicles, buses, trucks and bikes along with Energy Stationary Storage.

CEO of iM3NY Chaitanya Sharma commented: “The new equipment is of exceptional value to us as it will enhance critical learnings to advance technologies and help reduce the cost and time required to build our first gigawatt production line. We look forward to being a leading provider of American-made batteries for products both American-made and internationally produced and to becoming a valued member of the community in Endicott, NY.”

Magnis Chairman Frank Poullas commented: “Following Magnis Chairman Frank Poullas commented: our successful capital raising last week, the iM3NY team is busy in the development phase and beginning production in late 2021.”

This announcement has been authorised for release by the Board of Magnis Energy Technologies Limited (ACN 115 111 763).

For further information:

Frank Poullas

Executive Chairman

Ph: +61 2 8397 9888

www.magnis.com.au

Suite 9.03 Aurora Place, 88 Phillip Street, Sydney NSW 2000

Click here to connect with Magnis Energy Technologies (ASX:MNS) for an Investor Presentation.

Click here for the full ASX announcement.

Torian Resources Limited Significant Gold Results from Surface at Mt Stirling

Perth, Australia (ABN Newswire) – Torian Resources Ltd (ASX:TNR) is pleased to advise that recent drilling results continue to extend the Mt Stirling Gold System over ~1.1km of Strike, ~300m at depth, and it remains open in multiple directions.

Highlights:

– The interpreted strike of the Mt Stirling gold system exceeds 1.160km with Mt Stirling Main Zone; Hanging Wall and Viserion lodes all remaining open along strike and down-dip.

Keep reading... Show less

eMetals Limited Updates Shareholders On Exploration – April 12, 2021

eMetals Limited (ASX:EMT) (eMetals or Company) is pleased to update shareholders on exploration activities which have commenced across the Company’s projects.

HIGHLIGHTS

Keep reading... Show less

Discovery Harbour Provides Newcrest’s Planned Program for Fortuity 89, Nevada

Discovery Harbour Resources Corp. (TSXV: DHR) (OTC Pink: DCHRF) (FSE: 4GW) (the “Company” or “Discovery Harbour”) is pleased to announce that Newcrest Resources Inc., a wholly owned subsidiary of Newcrest Mining Limited (“Newcrest”), has provided the details of its planned program for the Fortuity 89 epithermal gold property in Nevada.

The Fortuity 89 property covers very limited outcrop surrounded by a large covered area. The outcrop and interpreted geology are prospective for concealed low sulphidation epithermal gold mineralization below shallow unconsolidated alluvial gravels. Newcrest’s planned activities include a geophysical program encompassing a 675 line kilometre drone airborne magnetic survey, a 250 station ground gravity survey and a 45 line kilometre audio band magnetotellurics (AMT) resistivity survey. It is intended that geologic and alteration sampling and mapping will also be undertaken with a soil geochemical sampling program. The intended outcome of this program is to identify potential drill targets for testing this calendar year.

Keep reading... Show less

Blackdome-Elizabeth Gold Project 2021 Exploration Plan and Update

Tempus Resources Ltd. (“Tempus” or “the Company”) (ASX:TMR)(TSXV:TMRR) is pleased to provide an update on the exploration plan for the upcoming field season at the Blackdome-Elizabeth Gold Project, located in British Columbia, Canada

The 2021 exploration program at Elizabeth and Blackdome is fully permitted and on schedule to commence at the end of Q2, 2021. The program will consist of 7,500 metres of down plunge and along strike diamond drilling at Elizabeth to expand the known gold mineralisation, in parallel with detailed alteration and mapping studies at Blackdome in support of future resource expansion drilling.

Keep reading... Show less

Rio Tinto reaches agreement with Turquoise Hill Resources on financing plan for Oyu Tolgoi

Rio Tinto has entered into a binding Heads of Agreement (HoA) with Turquoise Hill Resources (TRQ) for an updated funding plan (the “Funding Plan”) for the completion of the Oyu Tolgoi (OT) Underground Project in Mongolia. The Funding Plan addresses the estimated remaining known funding requirement of approximately $2.3 billion 1 , building on and replacing the arrangements established in the Memorandum of Understanding that Rio Tinto and TRQ previously entered into on 9 September, 2020.

Under the HoA, subject to securing approval by OT LLC and any required support from the Government of Mongolia, and subject to timing, availability, and terms and conditions being acceptable to both parties, Rio Tinto and TRQ will:

Keep reading... Show less

Top News

Related News