Galan Lithium

Quarterly Activities Report March 2023

The Board of Galan Lithium Limited (“Galan” or the “Company”) is pleased to provide this Quarterly Activities Report for the quarter ended 31 March 2023 to the date of this report. The focus for the quarter was the continued progression of the Definitive Feasibility Study (“DFS”) and associated works/activities, including optimisations, well pump testing and further drilling at its 100% owned, high-grade/low-impurity Hombre Muerto West (“HMW”) Project in the Catamarca Province, Argentina as well as the commencement of drilling at its wholly owned Greenbushes South lithium project in Western Australia.


HIGHLIGHTS

Hombre Muerto West (HMW) DFS:

  • Board appointed Advisor, Juan Carlos Barrera (ex SQM VP Operations) and newly appointed Director, Ms Claudia Pohl drive DFS optimisation and review
  • Long-term production development plan, including Candelas, updated; Total production increase from 34ktpa to 60ktpa LCE over 4 stages
  • DFS optimisation across two phases; 1st phase end May’23 and 2nd phase Aug’23
  • Updated HMW Resource imminent; HMW Reserve model to follow with DFS

HMW Exploration:

  • Positive airlift testing results at Santa Barbara plus geophysical survey work confirm brine continuity and high grade
  • 4th production well completed at Rana de Sal; Hydraulic tests to start in May’23
  • Commenced drilling of 5th production at Del Condor

Candelas

  • 100% ownership of Candelas completed

Greenbushes South:

  • Drilling commenced at Galan’s 100% owned Greenbushes South Lithium Project, located only 3km from the world-class Greenbushes Lithium Mine

Corporate:

  • Ms Claudia Pohl, ex senior SQM executive, appointed to Board
  • Juan Carlos Barrera, former SQM VP Operations appointed as Advisor
  • Cash and investments at the end of quarter ≈A$28 million

OPERATIONS

Mineral Resources

Please also refer to the JORC Code Tables, 2012 Edition, as detailed in Annexure 1 of the Galan ASX announcement dated 24 October 2022 entitled “Spectacular 2.5x Increase in HMW Resource – Now 5.8 Mt LCE @ 866 mg/l Li (76% in Measured Category)”.

The original Mineral Resource Estimate (“MRE”) was completed by SRK Consulting (Australasia) (“SRK”) in March 2020 (ASX: GLN 12 March 2020) and was based upon results from 1,054 metres of drilling within the Pata Pila, Rana de Sal and Casa del Inca tenement holdings at Hombre Muerto West. The hydrogeologic domains were constrained to logged units within the drillholes and supported by the interpretation of Controlled Source Audio-Frequency Magnetotellurics (CSMAT) and Transient Electromagnetic (TEM) geophysical profiles. Mineral Resource Estimates for lithium (reported as Li2CO3 equivalent) and potassium (KCl equivalent) were completed by SRK.

Table 1 summarises the updated MRE, incorporating the results of the 2021-2022 exploration campaign and reporting in accordance with the JORC Code (2012) guidelines. According to SRK, the Hombre Muerto West MRE is hosted within geologically well-defined zones of high-grade lithium mineralisation, including significant mineralised hydrogeologic domains.


Click here for the full ASX Release

This article includes content from Galan Lithium, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

GLN:AU
Galan Lithium

Galan Lithium Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Lithium Universe

Lithium Universe Limited (ASX: LU7) – Trading Halt

Description

The securities of Lithium Universe Limited (‘LU7’) will be placed in trading halt at the request of LU7, pending it releasing an announcement. Unless ASX decides otherwise, the securities will remain in trading halt until the earlier of the commencement of normal trading on Monday, 29 April 2024 or when the announcement is released to the market.

Keep reading...Show less
Quarterly Activities and Cash Flow Report for the Quarter Ended 31 March 2024

Quarterly Activities and Cash Flow Report for the Quarter Ended 31 March 2024

Atlantic Lithium looks ahead to major near-term value-drivers as it advances the Ewoyaa Lithium Project towards shovel-readiness

The Board of Atlantic Lithium Limited (AIM: ALL, ASX: A11, OTCQX: ALLIF, “Atlantic Lithium” or the “Company”), the African-focused lithium exploration and development company targeting to deliver Ghana’s first lithium mine, is pleased to announce its Quarterly Activities and Cash Flow Report for the period ended 31 March 2024.

Keep reading...Show less
White Cliff Minerals

Board Changes

White Cliff Minerals Limited (White Cliff or the Company) is pleased to announce the appointment of Mr. EricSondergaard (“Eric”) as Executive Director, effective immediately.
Keep reading...Show less
Oceana Lithium

Quarterly Activities Report for the Period Ended 31 March 2024

Oceana Lithium Limited (ASX: OCN, “Oceana” or “the Company”) is pleased to present its activities report for the March 2024 quarter.

Keep reading...Show less
Premier1 Lithium

Results From First Drilling at Abbotts North Confirm LCT System

Premier1 Lithium Limited (ASX:PLC) (“Premier1” or the “Company”) advises that results have been received from the first drilling program at Abbotts North located 35km north of Meekatharra, Western Australia. The results show elevated lithium across the stacked pegmatites of up to 0.41% Li2O (24ANR007), confirming the continuation of the LCT system down depth and along strike.

Keep reading...Show less
Galan Lithium

Galan Lithium Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×