Lake Resources Provides a Video Update on Drilling at Cauchari

Lake Resources Provides a Video Update on Drilling at Cauchari

Lake Resources NL (ASX:LKE) released today a video update from site of the drilling currently progressing at Lake’s 100% owned Cauchari Lithium Brine Project in Argentina.

Lake Resources NL (ASX:LKE) released today a video update from site of the drilling currently progressing at Lake’s 100% owned Cauchari Lithium Brine Project in Argentina where high-grade lithium brine results have been previously reported of up to 538 mg/L from high flow brines (refer ASX announcements 28 May, 12 June 2019). These results show the continuity of Lake’s drilling over a series of horizons extending similar results from adjoining major projects located in the heart of the Lithium Triangle.

The interview can be accessed at:
http://www.finnewsnetwork.com.au/MediaCenter/MediaCenterMobile.aspx?Site=FNN1579

and on the Presentations and Videos section of the Investors section on the Lake Resources website:
http://www.lakeresources.com.au/investors/?page=presentations-videos

The video shows the drilling progressing next to the Cauchari salt lake and adjoining pre-production works of Ganfeng/Lithium Americas (LAC). Lake is clearly drilling in the same basin with similar brines with the potential to replicate the success of similar projects.

The diamond drill rig has experienced challenging conditions due to sandy/gravel horizons and high fluid pressures and has not advanced beyond the previously reported depth while the section has been cleaned, conditioned and drilled, but is now making good progress toward the target zone. The target is a sand horizon estimated between 350-450m which has recorded higher lithium values and fluid flows in the adjoining project. Lake will update the market as the hole progresses.

Commenting on the drilling, Lake’s Managing Director Steve Promnitz said: “Lake has demonstrated proof that our Cauchari project is similar to the adjoining world class projects, and with the drilling continuing to progress, we see great potential to identify high-grade lithium values.

“Together with our emerging Kachi project in PFS stage, Lake is confident of delivering increased value for shareholders amid growing demand for these increasingly strategic assets in the heart of the Lithium Triangle.”

Competent Person’s Statement – Kachi Lithium Brine Project

The information contained in this ASX release relating to Exploration Results has been compiled by Mr Andrew Fulton. Mr Fulton is a Hydrogeologist and a Member of the Australian Institute of Geoscientists and the Association of Hydrogeologists. Mr Fulton has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a competent person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Andrew Fulton is an employee of Groundwater Exploration Services Pty Ltd and an independent consultant to Lake Resources NL. Mr Fulton consents to the inclusion in this announcement of this information in the form and context in which it appears.

About Lake Resources NL (ASX:LKE)

Lake Resources NL (ASX:LKE, Lake) is a lithium exploration and development company focused on developing its three lithium brine projects and hard rock project in Argentina, all owned 100%. The leases are in a prime location among the lithium sector’s largest players within the Lithium Triangle, where half of the world’s lithium is produced. Lake holds one of the largest lithium tenement packages in Argentina (~200,000Ha) secured in 2016 prior to a significant ‘rush’ by major companies. The large holdings provide the potential to provide consistent security of supply, scalable as required, which is demanded by battery makers and electric vehicle manufacturers.
The Kachi project covers 69,000 ha over a salt lake south of FMC’s lithium operation and near Albemarle’s Antofalla project in Catamarca Province. Drilling at Kachi has confirmed a large lithium brine bearing basin over 20km long, 15km wide and 400m to 800m deep. Drilling over Kachi (currently 16 drill holes, 3100m) has produced a maiden indicated and inferred resource of 4.4 Mt LCE (Indicated 1.0Mt and Inferred 3.4Mt) (refer ASX announcement 27 November 2018).

A direct extraction technique is being tested in partnership with Lilac Solutions, which has shown 80-90% recoveries and lithium brine concentrations in excess of 25000 mg/L lithium. Phase 1 Engineering Study results have shown operating costs forecast at US$2600/t LCE in the lowest cost quartile (refer ASX announcement 10 December 2018). This process is will be trialed on site with a pilot plant in tandem with conventional methods as part of the PFS underway. Discussions are advanced with a number of downstream entities, mainly battery makers, to jointly develop the project.

The Olaroz-Cauchari and Paso brine projects are located adjacent to major world class brine projects either in production or being developed in the highly prospective Jujuy Province. The Olaroz-Cauchari project is located in the same basin as Orocobre’s Olaroz lithium production and adjoins Ganfeng Lithium/Lithium Americas Cauchari project, with high grade lithium (600 mg/L) with high flow rates drilled immediately across the lease boundary.

A new drill rig is being used to increase the depth capacity and speed at Cauchari. High grades and high flow rates have been reported over a series of horizons, similar to lithium brine horizons announced from adjoining pre-production areas under development. Results provide further confirmation of the continuity of lithium bearing horizons and demonstrate that Lake is drilling in the same basin as adjoining world-class major projects (refer ASX announcements 28 May, 12 June 2019). Better results are anticipated at depth. High fluid pressures have meant that conditions are challenging. This will be followed by drilling extensions to the Olaroz area in LKE’s 100% owned Olaroz leases.
Significant corporate transactions continue in adjacent leases with development of Ganfeng Lithium/Lithium Americas Cauchari project with Ganfeng announcing a US$237 million for 37% of the Cauchari project previously held by SQM, followed by a further US$160 million to increase Ganfeng’s equity position to 50% on 1 April 2019, together with a resource that had doubled to be the largest on the planet. Ganfeng then announced a 10 year lithium supply agreement with Volkswagen on 5 April 2019. Nearby projects of Lithium X were acquired via a takeover offer of C$265 million completed March 2018. The northern half of Galaxy’s Sal de Vida resource was purchased for US$280 million by POSCO in June-Dec 2018. LSC Lithium was acquired in Jan-Mar 2019 for C$111 million by a mid-tier oil & gas company with a resource size half of Kachi. These transactions imply an acquisition cost of US$55-110 million per 1 million tonnes of lithium carbonate equivalent (LCE) in resources.

Click here to connect with Lake Resources NL (ASX:LKE) for an Investor Presentation

High Purity 99.97% Battery Quality Lithium Carbonate Produced from Kachi Brines

  • High purity 99.97% lithium carbonate produced by Hazen Research Inc from lithium chloride produced at the Lilac Solutions pilot plant module from Lake’s Kachi brines.
  • Samples have very low impurities; Lake expects this product to be attractive for the battery market.
  • Lake Resources is confident of replicating these results at full production
  • Sample production by Hazen to continue with samples expected to be sent to Novonix and supply chain customers in Asia and Europe for battery tests, anticipated this quarter.

Keep reading... Show less

Hazen Well-advanced Producing Battery Quality Lithium Carbonate

Clean lithium developer Lake Resources NL (ASX:LKE; OTC:LLKKF) announced today further progress towards the development of sustainable, high-purity lithium, following confirmation that Hazen Research Inc (Hazen), an independent assay laboratory, is well advanced in producing initial larger samples of battery quality lithium carbonate.

Initial samples are anticipated within 15-18 days, with more samples to follow progressively as brines are delivered and processed, according to the Colorado-based company. Hazen is conducting a thorough analysis to optimize the process for a superior product. The outcome will be beneficial as treatment is commenced of the larger samples in the near future.

Keep reading... Show less

Lake Resources NL Presenting at ASX Small and Mid-Cap Conference 2020

Clean lithium developer Lake Resources NL (ASX:LKE) (FRA:LK1) (OTCMKTS:LLKKF) announced today that Managing Director Steve Promnitz will present at the ASX Small and Mid-Cap Conference 2020 on Wednesday, 9 September at 10.45am AEST (Sydney), 8.45am (Hong Kong), 5.45pm Tuesday (Vancouver/ San Francisco). The conference focuses on showcasing emerging leaders in the small and mid-cap category.

Lake recently announced the impending delivery of high purity, responsibly-sourced, battery-quality lithium carbonate from its technology partner Lilac Solutions’ pilot plant in California. Hazen Research Inc, an independent assay laboratory, is currently producing larger samples of battery-quality lithium carbonate from the first samples of lithium chloride successfully produced from the direct lithium extraction pilot plant, using brines from Lake’s Kachi Lithium Brine Project. The samples show high lithium concentrations, as previously demonstrated at lab scale (refer ASX announcement, 9 January 2020).

Keep reading... Show less

Elizabeth Gold Project Drilling Update

Tempus Resources Ltd (“Tempus” or ” the Company” ) (ASX:TMR)(TSX.V:TMRR)(OTCQB:TMRFF) is pleased to provide an update of the drilling program at the Elizabeth Gold Project in Southern BC, Canada

The 2021 drilling campaign began on June 5 th . Five diamond drill holes have been completed to date for a total of 774 metres. Drill hole EZ-21-04, drilled on the Northern extension zone of the South West vein, has intersected a wide zone of quartz veining (approximately 4.2-metres), from 121.8-126.0 m, with visible gold evident over approximately one metre (see Figure 1). Additional quartz veining with visible gold has been identified in diamond drill hole EZ-21-02.

Keep reading... Show less

Galaxy Resources Limited Announcement

Galaxy Resources Limited (ASX: GXY) ( Company ) advises that the following announcement has been made to the Australian Securities Exchange which appears on the Company’s platform (ASX):

  • Change of Director’s interest Notice – MR

The announcement can be viewed at:

Keep reading... Show less

Lake Resources Managing Director: Definitive Feasibility Study for Kachi Lithium Project is Underway

Following an increased focus by electric vehicle makers on supply chain sustainability, Lake Resources NL (ASX:LKE,FWB:LK1,OTCQB:LLKKF) is advancing debt funding options for its flagship Kachi lithium project, and Managing Director Stephen Promnitz says the company is charging ahead to address the surge in battery market demand.

Lake Resources Managing Director: Definitive Feasibility Study for Kachi Lithium Project is Underway youtu.be

Keep reading... Show less

Rio Tinto opens new scandium plant in Canada

Rio Tinto has started operations at a new commercial scale demonstration plant to produce high-quality scandium oxide at its Rio Tinto Fer et Titane (RTFT) metallurgical complex in Sorel-Tracy, Quebec.

The $6 million project, in which the Government of Quebec contributed approximately $650,000 through the Quebec Plan for the Development of Critical and Strategic Minerals, was completed on time and on budget, less than six months after the start of construction.

Keep reading... Show less

Rio Tinto confirms Peter Cunningham as Chief Financial Officer

Rio Tinto has appointed Peter Cunningham as Chief Financial Officer with immediate effect. Peter, who has been Interim Chief Financial Officer since 1 January 2021, will also join the Rio Tinto Board as an executive director at the same time.

Peter was previously Group Controller and has held a number of senior financial and non-financial leadership positions across Rio Tinto in Australia and the UK. In a career spanning 28 years with Rio Tinto, he has held roles including Global Head of Health, Safety, Environment & Communities; Head of Energy and Climate Strategy; and Head of Investor Relations. Prior to joining Rio Tinto, Peter qualified as a chartered accountant.

Keep reading... Show less

Elizabeth Gold Project Drilling Update

Tempus Resources Ltd (“Tempus” or ” the Company” ) (ASX:TMR)(TSX.V:TMRR)(OTCQB:TMRFF) is pleased to provide an update of the drilling program at the Elizabeth Gold Project in Southern BC, Canada

The 2021 drilling campaign began on June 5 th . Five diamond drill holes have been completed to date for a total of 774 metres. Drill hole EZ-21-04, drilled on the Northern extension zone of the South West vein, has intersected a wide zone of quartz veining (approximately 4.2-metres), from 121.8-126.0 m, with visible gold evident over approximately one metre (see Figure 1). Additional quartz veining with visible gold has been identified in diamond drill hole EZ-21-02.

Keep reading... Show less

Galaxy Resources Limited Announcement

Galaxy Resources Limited (ASX: GXY) ( Company ) advises that the following announcement has been made to the Australian Securities Exchange which appears on the Company’s platform (ASX):

  • Change of Director’s interest Notice – MR

The announcement can be viewed at:

Keep reading... Show less

Rio Tinto opens new scandium plant in Canada

Rio Tinto has started operations at a new commercial scale demonstration plant to produce high-quality scandium oxide at its Rio Tinto Fer et Titane (RTFT) metallurgical complex in Sorel-Tracy, Quebec.

The $6 million project, in which the Government of Quebec contributed approximately $650,000 through the Quebec Plan for the Development of Critical and Strategic Minerals, was completed on time and on budget, less than six months after the start of construction.

Keep reading... Show less

Rio Tinto confirms Peter Cunningham as Chief Financial Officer

Rio Tinto has appointed Peter Cunningham as Chief Financial Officer with immediate effect. Peter, who has been Interim Chief Financial Officer since 1 January 2021, will also join the Rio Tinto Board as an executive director at the same time.

Peter was previously Group Controller and has held a number of senior financial and non-financial leadership positions across Rio Tinto in Australia and the UK. In a career spanning 28 years with Rio Tinto, he has held roles including Global Head of Health, Safety, Environment & Communities; Head of Energy and Climate Strategy; and Head of Investor Relations. Prior to joining Rio Tinto, Peter qualified as a chartered accountant.

Keep reading... Show less

Hastings Technology Metals Ltd Stand-out Simon’s Find Metallurgical Test Results Amended

Perth, Australia (ABN Newswire) – Australia’s next rare earths producer Hastings Technology Metals Ltd (ASX:HAS) (5AM.F) is pleased to announce stand-out results from metallurgical test work carried out on drilling samples from Simon’s Find, one of the key deposits that make up the Yangibana Rare Earths Project (Yangibana) in Western Australia’s Gascoyne region.

The test work carried out at Simon’s Find is a key milestone in the Company’s finalisation of its updated Ore Reserves and mine scheduling that will underpin Yangibana’s development.

The Simon’s Find deposit is part of the 8km-long Bald Hill – Simon’s Find – Frasers mineralised trend and is strategically located close to the site of Yangibana’s proposed process plant and infrastructure.

Keep reading... Show less

Rio Tinto and ARENA to study using hydrogen to reduce carbon emissions in alumina refining

Rio Tinto has partnered with the Australian Renewable Energy Agency (ARENA) to study whether hydrogen can replace natural gas in alumina refineries to reduce emissions.

Rio Tinto will conduct a $1.2 million feasibility study, equally funded with ARENA through a $580,000 grant, into using clean hydrogen to replace natural gas in the calcination process of refining at the Yarwun aumina refinery in Gladstone.

Keep reading... Show less

Top News

Related News