Lake Resources Provides Quarterly Report

Lake Resources Provides Quarterly Report

Lake Resources NL (ASX:LKE) provided an update on the company’s activities and financials.

Lake Resources NL (ASX:LKE) provided an update on the company’s activities and financials. According the the Quarterly Report, “Lake Resources held cash of $0.1 million as at 30 September 2019 (in AUD, USD and Argentine Pesos). An additional $1.5 million was provided to Lake in October.”

The company also announce the Annual General Meeting of Shareholders at 11:00AM AEDT on 26 November 2019 at Automic Group, Level 5, 126 Phillip Street, Sydney NSW 2000.

Highlights from the report included the following:

  • Targeting pre-production in early 2020 from pilot plant (under construction) using partner Lilac Solutions’ efficient, direct extraction ion exchange process to produce a premium low impurity lithium product in lower part of industry cost curve. First pilot plant module completed.

  • Sample product available from pilot plant production to be sent for customer qualification purposes for off-takers and potential project partners in South Korea, Japan, China.

  • High quality, low impurity product expected, capable of attracting premium pricing in current market.

  • Pre-Feasibility Study (PFS) near completion fort the Kachi Lithium Brine Project, a Top 10 global lithium brine project, using direct lithium extraction process.

  • SD Capital Advisory Limited appointed to secure debt funding of up to US$25 million for initial lithium production from its Kachi Lithium Brine Project and Cauchari Lithium Brine Project in Argentina, together with completion of the DFS.

  • Confirmation of significant high grade lithium brine discovery over 506m interval at Cauchari Lithium Brine Project, with results up to 540 mg/L lithium, averaged 493 mg/L (over 343m).

  • A likely extension to the adjoining world-class project has been identified, which has similar results of 580mg/L lithium average grade in Indicated resource (1) and is under construction for production next year(Ganfeng/Lithium Americas (NYSE:LAC)).

  • An additional $1.5 million provided to Lake in October.

For the full report, click here.

Click here to connect with Lake Resources NL (ASX:LKE) for an Investor Presentation

High Purity 99.97% Battery Quality Lithium Carbonate Produced from Kachi Brines

  • High purity 99.97% lithium carbonate produced by Hazen Research Inc from lithium chloride produced at the Lilac Solutions pilot plant module from Lake’s Kachi brines.
  • Samples have very low impurities; Lake expects this product to be attractive for the battery market.
  • Lake Resources is confident of replicating these results at full production
  • Sample production by Hazen to continue with samples expected to be sent to Novonix and supply chain customers in Asia and Europe for battery tests, anticipated this quarter.

Keep reading... Show less

Hazen Well-advanced Producing Battery Quality Lithium Carbonate

Clean lithium developer Lake Resources NL (ASX:LKE; OTC:LLKKF) announced today further progress towards the development of sustainable, high-purity lithium, following confirmation that Hazen Research Inc (Hazen), an independent assay laboratory, is well advanced in producing initial larger samples of battery quality lithium carbonate.

Initial samples are anticipated within 15-18 days, with more samples to follow progressively as brines are delivered and processed, according to the Colorado-based company. Hazen is conducting a thorough analysis to optimize the process for a superior product. The outcome will be beneficial as treatment is commenced of the larger samples in the near future.

Keep reading... Show less

Lake Resources NL Presenting at ASX Small and Mid-Cap Conference 2020

Clean lithium developer Lake Resources NL (ASX:LKE) (FRA:LK1) (OTCMKTS:LLKKF) announced today that Managing Director Steve Promnitz will present at the ASX Small and Mid-Cap Conference 2020 on Wednesday, 9 September at 10.45am AEST (Sydney), 8.45am (Hong Kong), 5.45pm Tuesday (Vancouver/ San Francisco). The conference focuses on showcasing emerging leaders in the small and mid-cap category.

Lake recently announced the impending delivery of high purity, responsibly-sourced, battery-quality lithium carbonate from its technology partner Lilac Solutions’ pilot plant in California. Hazen Research Inc, an independent assay laboratory, is currently producing larger samples of battery-quality lithium carbonate from the first samples of lithium chloride successfully produced from the direct lithium extraction pilot plant, using brines from Lake’s Kachi Lithium Brine Project. The samples show high lithium concentrations, as previously demonstrated at lab scale (refer ASX announcement, 9 January 2020).

Keep reading... Show less

Elizabeth Gold Project Drilling Update

Tempus Resources Ltd (“Tempus” or ” the Company” ) (ASX:TMR)(TSX.V:TMRR)(OTCQB:TMRFF) is pleased to provide an update of the drilling program at the Elizabeth Gold Project in Southern BC, Canada

The 2021 drilling campaign began on June 5 th . Five diamond drill holes have been completed to date for a total of 774 metres. Drill hole EZ-21-04, drilled on the Northern extension zone of the South West vein, has intersected a wide zone of quartz veining (approximately 4.2-metres), from 121.8-126.0 m, with visible gold evident over approximately one metre (see Figure 1). Additional quartz veining with visible gold has been identified in diamond drill hole EZ-21-02.

Keep reading... Show less

Galaxy Resources Limited Announcement

Galaxy Resources Limited (ASX: GXY) ( Company ) advises that the following announcement has been made to the Australian Securities Exchange which appears on the Company’s platform (ASX):

  • Change of Director’s interest Notice – MR

The announcement can be viewed at:

Keep reading... Show less

Lake Resources Managing Director: Definitive Feasibility Study for Kachi Lithium Project is Underway

Following an increased focus by electric vehicle makers on supply chain sustainability, Lake Resources NL (ASX:LKE,FWB:LK1,OTCQB:LLKKF) is advancing debt funding options for its flagship Kachi lithium project, and Managing Director Stephen Promnitz says the company is charging ahead to address the surge in battery market demand.

Lake Resources Managing Director: Definitive Feasibility Study for Kachi Lithium Project is Underway youtu.be

Keep reading... Show less

Rio Tinto opens new scandium plant in Canada

Rio Tinto has started operations at a new commercial scale demonstration plant to produce high-quality scandium oxide at its Rio Tinto Fer et Titane (RTFT) metallurgical complex in Sorel-Tracy, Quebec.

The $6 million project, in which the Government of Quebec contributed approximately $650,000 through the Quebec Plan for the Development of Critical and Strategic Minerals, was completed on time and on budget, less than six months after the start of construction.

Keep reading... Show less

Rio Tinto confirms Peter Cunningham as Chief Financial Officer

Rio Tinto has appointed Peter Cunningham as Chief Financial Officer with immediate effect. Peter, who has been Interim Chief Financial Officer since 1 January 2021, will also join the Rio Tinto Board as an executive director at the same time.

Peter was previously Group Controller and has held a number of senior financial and non-financial leadership positions across Rio Tinto in Australia and the UK. In a career spanning 28 years with Rio Tinto, he has held roles including Global Head of Health, Safety, Environment & Communities; Head of Energy and Climate Strategy; and Head of Investor Relations. Prior to joining Rio Tinto, Peter qualified as a chartered accountant.

Keep reading... Show less

Elizabeth Gold Project Drilling Update

Tempus Resources Ltd (“Tempus” or ” the Company” ) (ASX:TMR)(TSX.V:TMRR)(OTCQB:TMRFF) is pleased to provide an update of the drilling program at the Elizabeth Gold Project in Southern BC, Canada

The 2021 drilling campaign began on June 5 th . Five diamond drill holes have been completed to date for a total of 774 metres. Drill hole EZ-21-04, drilled on the Northern extension zone of the South West vein, has intersected a wide zone of quartz veining (approximately 4.2-metres), from 121.8-126.0 m, with visible gold evident over approximately one metre (see Figure 1). Additional quartz veining with visible gold has been identified in diamond drill hole EZ-21-02.

Keep reading... Show less

Galaxy Resources Limited Announcement

Galaxy Resources Limited (ASX: GXY) ( Company ) advises that the following announcement has been made to the Australian Securities Exchange which appears on the Company’s platform (ASX):

  • Change of Director’s interest Notice – MR

The announcement can be viewed at:

Keep reading... Show less

Rio Tinto opens new scandium plant in Canada

Rio Tinto has started operations at a new commercial scale demonstration plant to produce high-quality scandium oxide at its Rio Tinto Fer et Titane (RTFT) metallurgical complex in Sorel-Tracy, Quebec.

The $6 million project, in which the Government of Quebec contributed approximately $650,000 through the Quebec Plan for the Development of Critical and Strategic Minerals, was completed on time and on budget, less than six months after the start of construction.

Keep reading... Show less

Rio Tinto confirms Peter Cunningham as Chief Financial Officer

Rio Tinto has appointed Peter Cunningham as Chief Financial Officer with immediate effect. Peter, who has been Interim Chief Financial Officer since 1 January 2021, will also join the Rio Tinto Board as an executive director at the same time.

Peter was previously Group Controller and has held a number of senior financial and non-financial leadership positions across Rio Tinto in Australia and the UK. In a career spanning 28 years with Rio Tinto, he has held roles including Global Head of Health, Safety, Environment & Communities; Head of Energy and Climate Strategy; and Head of Investor Relations. Prior to joining Rio Tinto, Peter qualified as a chartered accountant.

Keep reading... Show less

Hastings Technology Metals Ltd Stand-out Simon’s Find Metallurgical Test Results Amended

Perth, Australia (ABN Newswire) – Australia’s next rare earths producer Hastings Technology Metals Ltd (ASX:HAS) (5AM.F) is pleased to announce stand-out results from metallurgical test work carried out on drilling samples from Simon’s Find, one of the key deposits that make up the Yangibana Rare Earths Project (Yangibana) in Western Australia’s Gascoyne region.

The test work carried out at Simon’s Find is a key milestone in the Company’s finalisation of its updated Ore Reserves and mine scheduling that will underpin Yangibana’s development.

The Simon’s Find deposit is part of the 8km-long Bald Hill – Simon’s Find – Frasers mineralised trend and is strategically located close to the site of Yangibana’s proposed process plant and infrastructure.

Keep reading... Show less

Rio Tinto and ARENA to study using hydrogen to reduce carbon emissions in alumina refining

Rio Tinto has partnered with the Australian Renewable Energy Agency (ARENA) to study whether hydrogen can replace natural gas in alumina refineries to reduce emissions.

Rio Tinto will conduct a $1.2 million feasibility study, equally funded with ARENA through a $580,000 grant, into using clean hydrogen to replace natural gas in the calcination process of refining at the Yarwun aumina refinery in Gladstone.

Keep reading... Show less

Top News

Related News