Alvo Minerals

Large Extension Of High-Grade Copper And Zinc Mineralisation

Alvo Minerals Limited (ASX: ALV) (“Alvo” or the “Company”) is pleased announce new assay results from its ongoing extensional diamond drill program at the C3 prospect, within the Palma Project (“Palma” or “the project”) located in Central Brazil. The Company has completed a total of 16,790m of diamond drilling from listing in October 2021 and has now resumed drilling after a short break over the festive season.


HIGHLIGHTS

  • Extensional drilling at the Palma Volcanic hosted Massive Sulphide (“VMS”) Project delivers significant high-grade mineralisation, including:
    • PD3-059: 14.2m @ 3.0% CuEq* (1.1% Cu, 6.1% Zn, 0.2% Pb, 12g/t Ag & 0.04g/t Au) from 228m
      • Inc. 4.8m @ 7.3% CuEq (1.8% Cu, 16.8% Zn, 0.4% Pb, 24g/t Ag & 0.1g/t Au) from 237m
    • PD3-065: 13.0m @ 1.5% CuEq, (1.0% Cu, 1.8% Zn, 0.1% Pb, 8g/t Ag & 0.02g/t Au) from 333m
      • Inc. 4.7m @ 3.1% CuEq (1.9% Cu, 4.6% Zn, 0.31% Pb, 21g/t Ag & 0.05g/t Au) from 340m
    • PD3-065: 14m @ 1.7% CuEq, (0.7% Cu, 3.3% Zn, 0.2% Pb, 10g/t Ag & 0.03g/t Au) from 376m
      • Inc. 5.3m @ 3.6% CuEq (1% Cu, 8% Zn, 0.5% Pb, 25g/t Ag & 0.05g/t Au) from 379m
  • High-grade mineralisation intersected approximately 50m down-dip of the existing JORC 2012 Mineral
  • Resource Estimate (“MRE”)
  • These first results reported from the Phase 2 exploration program follow the exceptional Phase 1 drill results that both confirmed, enhanced and extended mineralisation defined by historic results, including:
    • PD3-001: 25.0m @ 6.3% CuEq (1.8% Cu, 14.1% Zn, 0.2% Pb, 17g/t Ag & 0.11g/t Au) from 187m
      • Inc. 9.0m @ 8.2% CuEq (2.9% Cu, 17.2% Zn, 0.3% Pb, 20g/t Ag & 0.09g/t Au) from 198m
    • PD3-007: 23.2m @ 5.5% CuEq (3.3% Cu, 8.1% Zn, 0.3% Pb, 31g/t Ag & 0.12g/t Au) from 259m
      • Inc. 10.6m @ 10.1% CuEq (6.3% Cu, 14.8% Zn, 0.2% Pb, 40g/t Ag & 0.23g/t Au) from 267m
  • Phase 1 and initial Phase 2 drill results continue to exceed expectations on grade and thickness when compared to the existing MRE that used historical drilling only
  • Phase 2 drilling is ongoing at C3, with aggressive step-outs down-plunge, aiming to significantly expand the MRE of 4.6Mt @ 1.0% Cu, 3.9% Zn, 0.4% Pb & 20g/t Ag
  • Having resumed after the Christmas break, Phase 2 drilling will continue targeting new prospects within the C3 VMS cluster including Mafico, Ema and Pelicano
  • Down-Hole Electromagnetic surveys (“DHEM”) at C3 have highlighted conductive plates that demonstrate the potential to significantly expand C3 mineralisation and is assisting with the extensional drilling

*Refer to the detailed explanation of assumptions and pricing underpinning the copper equivalent (CuEq) on page 6 of this announced and in Section 2 of the attached JORC Code Table (Appendix 1)

Rob Smakman, Alvo’s Managing Director commented on the exploration:

"We have had a great start to our C3 resource expansion drilling, receiving high-grades and thick intercepts beyond the known JORC Resource from the initial Phase 2 drill results. We are looking forward to a busy 2023 where we will continue to expand on the known MRE and develop new targets across the remaining 60km of underexplored explored VMS district at Palma.

With our wide range of in-house exploration equipment and our established exploration team, we are extremely focussed on expansion and discovery. We are set to build on our highly successful 2022 exploration program in 2023 as we accelerate exploration in an environment of high base metals prices, with the outlook for copper looking especially positive.

The timing is right for 2023 to significantly increase value for all Alvo shareholders.”

Diamond Drilling at C3

Phase 2 drilling at C3 is aiming to expand the existing Palma Project MRE of 4.6Mt @ 1.0% Cu, 3.9% Zn, 0.4% Pb & 20g/t Ag (see Figure 1). Phase 2 drilling follows an exceptional Phase 1 drill program that delivered high-grade Copper and Zinc in thick VMS intercepts. Phase 1 and initial Phase 2 drill results continue to exceed expectations on grade and thickness when compared to the existing JORC 2012 MRE that used historical drilling only.


Click here for the full ASX Release

This article includes content from Alvo Minerals, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.
ALV:AU
The Conversation (0)

Trilogy Metals Provides Update on the Ambler Access Project

Trilogy Metals Inc. (TSX: TMQ) (NYSE American: TMQ) ("Trilogy" or the "Company") is providing an update on the Ambler Access Project - the proposed 211-mile, industrial-use-only road from the Upper Kobuk Mineral Projects to the Dalton Highway that would enable the advancement of exploration and development at the Ambler Mining District, home to some of the world's richest known copper-dominant polymetallic deposits.

On April 16, 2024 , the Alaska Industrial Development and Export Authority ("AIDEA") issued a press release in response to media reports indicating the Department of Interior plans to block access to the Ambler Mining District by issuing a "no action" decision.  In its press release, AIDEA strongly urges the Department of Interior to comply with federal law and the promises made at statehood to allow access to state lands and minerals for the Ambler Access Road Project.

News Provided by PR Newswire via QuoteMedia

Keep reading...Show less
Russian flag with "sanctions" written in the middle encompassed by the EU flag.

LME Sanctions on Russian Metal Push Copper, Nickel and Aluminum Prices Higher

Prices for several metals jumped this week as the London Metal Exchange (LME) banned metal produced in Russia from its system. The moratorium applies to material produced on or after April 13 of this year.

The restrictions apply to copper, nickel and aluminum, and were passed down by the US Department of the Treasury and the British government on April 12. They are also in place for the Chicago Mercantile Exchange (CME).

Keep reading...Show less
Trident Royalties PLC

Trident Royalties PLC


Keep reading...Show less
Forum Energy: Ambient Noise Tomography Survey Establishes New Drill Targets over 1+ km Extension Along the Tatiggaq Fault Zone, Aberdeen Uranium Project, Nunavut

Forum Energy: Ambient Noise Tomography Survey Establishes New Drill Targets over 1+ km Extension Along the Tatiggaq Fault Zone, Aberdeen Uranium Project, Nunavut

Forum Energy Metals Corp. (TSXV: FMC) (OTCQB: FDCFF) ("Forum" or the "Company") has reviewed initial data processed from its Ambient Noise Tomography (ANT) survey conducted over the Tatiggaq anomaly during the summer of 2023, The survey successfully established new drill targets over a one plus kilometer east-northeast extension along the Tatiggaq fault zone, which hosts the high-grade Tatiggaq uranium discovery at Forum's 100% owned Aberdeen Project in the Thelon Basin, Nunavut. The Aberdeen project comprises 95,500 hectares and is located adjacent to Orano's 133 million pound Kiggavik uranium project* (Figure 1).

Dr. Rebecca Hunter, Forum's VP, Exploration commented, "The ANT survey may be a game-changing geophysical method for targeting unconformity systems in the northeast Thelon Basin. By measuring the velocity change interfaces throughout our anomalies, we can potentially image the faults that host the mineralization and the location of the mineralized bodies themselves. The survey results obtained suggest we will be able to target our drilling with a much higher degree of precision than what could be done in the past. I am very excited to resume on our Aberdeen Project in 2024."

News Provided by Newsfile via QuoteMedia

Keep reading...Show less

Ero Copper to Release First Quarter 2024 Operating and Financial Results on May 7, 2024

Ero Copper Corp. (TSX: ERO, NYSE: ERO) (the "Company") will publish its first quarter 2024 operating and financial results on Tuesday, May 7, 2024 after market close. The Company will host a conference call to discuss the results on Wednesday, May 8, 2024 at 11:30am Eastern time (8:30am Pacific time).

CONFERENCE CALL DETAILS

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×