Latin Resources

Ongoing Testwork Continues To Demonstrate Exceptional Metallurgy Of Salinas Lithium Project With Over 80% Recovery Of Li2o

Latin Resources Limited (ASX: LRS) (“Latin” or “the Company”) is pleased to provide an update on an expanded program of metallurgical test work completed on drill core from the Company’s 100% owned high-grade Salinas Lithium Project (“Salinas”) (Appendix 1).


HIGHLIGHTS

  • Crush size doubled to 12.5mm and recoveries and grade remain high demonstrating very coarse liberation of spodumene:
    • Average recovery of 80.5% of Li2O; and
    • production of extremely high-grade Li2O concentrate (up to 6.6%) from simple Heavy Liquid Separation (HLS).
  • Exceptionally clean concentrates in -12.5mm+6.3mm size range. Concentrates well above 7.0% and as high as 7.96% Li2O achieved.
  • Results show excellent consistency across the width and depth of the known ore body.
  • Very coarse liberation results in minimal fines generation (~12%) which indicates a final plant design may have a low reliance on floatation as a necessary step to achieving high Li2O recovery. In addition, it indicates a reduced size of any floatation plant if this option is pursued.
  • Consistently low Fe grades in head samples and HLS concentrates is promising for the marketability of Salinas concentrates.
  • The Company intends to proceed with bulk pilot plant testwork based on the very encouraging results obtained in this program.

Latin Resources’ General Manager of Geology, Tony Greenaway, commented:

“The latest round of testwork is extremely encouraging for our recoveries at Salinas and we are delighted with the consistency of results we have been able to achieve.

“We are very pleased to report very high recoveries and the production of a high-grade concentrate from simple HLS, and while these results cannot be directly translated to an operational environment, they do have very significant implications for the marketability and the economics of our concentrate.

“We intend to progress this into bulk pilot plant testwork, where we will optimise the flowsheet for the planned detailed PEA program that is planned to be completed by SGS in the first quarter next year.”

Colina Prospect – Metallurgical Test Work Results

Latin commissioned SGS GEOSOL laboratories (“SGS”), Belo Horizonte Brazil to undertake a program of HLS testwork on 10 samples representing the total strike length of the current resource drilling program. A total of 367kg of representative sample was collected and each of the samples included interstitial waste between ore zones to simulate expected mining dilution.

One of the main objectives of this program was to investigate potential variability in metallurgical performance across the deposit, and at varying depths. Half of the samples were targeted in the top 50-100m of the ore body with the other half of the samples taken from the bottom 100-150 of the deposit. Results have been independently reviewed and interpreted by Met Assist Pty Ltd, whose key personnel have significant experience in lithium processing, metallurgy, and process plant design.


Click here for the full ASX Release

This article includes content from Latin Resources, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

LRS:AU
The Conversation (0)
Chariot Corporation

Quarterly Activities Report – March 2024

Chariot Corporation Limited (“Chariot”, “CC9” or the “Company”) is pleased to present our Activities Report and Appendix 5B for the period ending 31 March 2024. In the first quarter of 2024, the Company announced its first hard rock lithium discovery, which was made during the first phase of its diamond core drilling program at Black Mountain, Wyoming USA (“Phase 1 Drilling Program”). Details of the Phase 1 Drilling Program results are set forth below. Chariot is well-positioned for 2024 with adequate liquidity to support further exploration activities across its lithium portfolio and to continue to deliver shareholder value.

Keep reading...Show less
Lithium Universe

Lithium Universe Limited (ASX: LU7) – Trading Halt

Description

The securities of Lithium Universe Limited (‘LU7’) will be placed in trading halt at the request of LU7, pending it releasing an announcement. Unless ASX decides otherwise, the securities will remain in trading halt until the earlier of the commencement of normal trading on Monday, 29 April 2024 or when the announcement is released to the market.

Keep reading...Show less
Quarterly Activities and Cash Flow Report for the Quarter Ended 31 March 2024

Quarterly Activities and Cash Flow Report for the Quarter Ended 31 March 2024

Atlantic Lithium looks ahead to major near-term value-drivers as it advances the Ewoyaa Lithium Project towards shovel-readiness

The Board of Atlantic Lithium Limited (AIM: ALL, ASX: A11, OTCQX: ALLIF, “Atlantic Lithium” or the “Company”), the African-focused lithium exploration and development company targeting to deliver Ghana’s first lithium mine, is pleased to announce its Quarterly Activities and Cash Flow Report for the period ended 31 March 2024.

Keep reading...Show less
White Cliff Minerals

Board Changes

White Cliff Minerals Limited (White Cliff or the Company) is pleased to announce the appointment of Mr. EricSondergaard (“Eric”) as Executive Director, effective immediately.
Keep reading...Show less
Oceana Lithium

Quarterly Activities Report for the Period Ended 31 March 2024

Oceana Lithium Limited (ASX: OCN, “Oceana” or “the Company”) is pleased to present its activities report for the March 2024 quarter.

Keep reading...Show less

Latest Press Releases

Related News

×