MTM Critical Metals

Over 500 Metres Of REE Mineralisation Intersected In First Diamond Drill Hole At The Pomme Project

MTM Critical Metals Limited (ASX:MTM) (MTM or the Company) is very pleased to report that over 500 metres of visible REE mineralisation has been intersected in the first diamond drill hole completed at the Pomme REE-Nb project in Québec, Canada (Pomme or the Project). Assay results are pending and expected within approximately 4 to 6 weeks.

Highlights:

  • Visible rare earth element (REE) mineralisation identified in drill core
  • Mineralisation verified using handheld XRF
  • 500+ metre intersection of variably mineralised carbonatite, open at depth
  • Sampling for detailed assays in progress, with results expected within 4 to 6 weeks
  • First of a 10 hole, 5,000 metres first-pass program to test the Pomme carbonatite complex and the known REE-niobium mineralisation.
Commenting on the completion of the first drill hole, MTM Managing Director Lachlan Reynolds said:

“We are extremely excited by the results of this first diamond drill hole. Not only has it intersected prospective carbonatite rocks but it also appears to be continuously mineralised over a 500+ metre interval and based on the visual estimates may contain a number of zones containing significant REE grade.

This hole is a vindication of our confidence that this drilling campaign at the Pomme project could have potential for making a major new rare earth element and niobium deposit discovery. We are now eagerly waiting in the results of assays and getting samples to the laboratory in Canada is a high priority. Drilling is ongoing and the second hole is underway.

The Kintavar Exploration team managing the exploration program on-site are congratulated for delivering this excellent result, which comes only 3 months after signing the option agreement over the project.”

DIAMOND DRILLING PROGRAM

A program of diamond drilling was recently commenced at Pomme (see MTM ASX announcement dated 26 May 2023). The first drill hole of that program, POM-23-01 (Figure 2), was subsequently completed at a depth of 558 metres downhole (Appendix I). This hole was collared approximately 100 metres to the north of a historical drill hole MVX-12-01 that also intersected in excess of 500 metres of REE-Nb mineralisation.

Figure 1: Diamond drill rig operational on hole POM-23-001 at the Pomme project, May 2023.

Figure 2: Diamond drilling status at the Pomme project showing historical and current diamond drill hole collar locations.

POM-23-01 intersected 31.75 metres of unconsolidated glacial sediments (till) at the top of the hole and then cored carbonatite rocks to the end of hole (EOH). The carbonatites show significant variation in lithology, including calciocarbonatite, ferrocarbonatite and silicocarbonatite (Appendix II). The carbonatites are open to depth beyond the EOH.


Click here for the full ASX Release

This article includes content from MTM Critical Metals, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

The Conversation (0)
EMU NL

Quarterly Activity Report 31 March 2024

EMU NL (ASX: EMU) (“EMU” or “the Company”) is pleased to report on its activities for the quarter ending 31 March 2024.

Keep reading...Show less
Redstone Resources

Quarterly Report for the Period Ending 31 March 2024

Redstone Resources Limited (ASX: RDS) (Redstone or the Company) is pleased to provide its quarterly report for the period ending 31 March 2024 (the Quarter).

Keep reading...Show less
Metals Australia

Metals Australia Quarterly Activities Report - to 31 March 2024

Metals Australia Limited (ASX: MLS) (“Metals Australia”, the “Company” or “MLS”) is pleased to report its activities for the quarter ended 31 March 2024 (“Quarter”):

Keep reading...Show less
Basin Energy Logo

Basin Energy Mining Exploration Entity or Oil and Gas Exploration Entity Quarterly Cash Flow Report

Basin Energy (ASX:BSN) is pleased to announced its mining exploration entity or oil and gas exploration entity quarterly cash flow report.

Keep reading...Show less
Basin Energy Logo

Basin Energy Quarterly Activities Report for the Period Ending 31 March 2024

Basin Energy Ltd (ASX: BSN) (‘Basin’, or the ‘Company’) is pleased to provide an overview of activities for the period ending 31 March 2024 (‘Quarter’, ‘Reporting Period’) and an accompanying Appendix 5B.

Keep reading...Show less
Auric Mining (ASX:AWJ)

Auric Mining Quarterly Activities Report

31 March 2024

Auric Mining Limited (ASX: AWJ) (Auricor the Company) is pleased to report on its activities during the 31 March 2024 Quarter and up to the date of this announcement.

Keep reading...Show less

Latest Press Releases

Related News

×