Paradox Lithium Project Strategic Expansion: DFS Targeting Production Capacity of 10,000tpa of Battery-Grade Lithium Carbona

Paradox Lithium Project Strategic Expansion: DFS Targeting Production Capacity of 10,000tpa of Battery-Grade Lithium Carbona

Anson Resources Limited (“Anson” or “the Company”) is pleased to provide the following update to the development strategy of the Paradox Lithium Project (“the Paradox Project”) in Utah, in the USA.


Highlights:
  • Anson confirms plans for a major increase in planned production capacity of its core asset, the Paradox Lithium Project in Utah, USA.
  • Project’s Detailed Feasibility Study (“DFS”) to target Stage 1 production capacity of 10,000 tonnes per annum of battery grade lithium carbonate.
    • This represents a 275% increase in production capacity from the 2,674tpa published in the Project’s Updated Preliminary Economic Assessment (1 September 2021).
  • Anson’s decision to increase lithium production capacity is driven by;
    • Anticipated significant JORC resource increase at the Project;
    • Growing lithium demand and higher lithium prices; and
    • Enhanced lithium recoveries and superior performance of Anson’s 99.95% purity lithium carbonate.
  • Bromine production capacity at the Paradox Project is to be added progressively, to align with forecast substantial demand growth for zincbromine batteries (for renewable energy storage) and other bromine derivative products.
  • Development of the Paradox Project is progressing rapidly, with the DFS being undertaken by leading engineering company Worley well advanced, and a major Resource expansion program ongoing.
  • Battery Grade Lithium Carbonate is currently selling for around US$79,550/t1.

Substantial developments in the lithium market, combined with the unique attributes of the Paradox Project, have allowed Anson to pursue a major expansion of the planned Stage 1 Lithium Carbonate production capacity to 10,000 tonnes per annum.

This represents an increase in planned production capacity of 275% on the 2,674 tonnes per annum target previously reported in the Paradox Project’s Updated Preliminary Economic Assessment (ASX announcement, 1 September 2021).

This strategic expansion will be incorporated into the Paradox Project’s Detailed Feasibility Study (“DFS”), which is being undertaken by global engineering firm, Worley.

This major expansion in planned production capacity is driven by:

  • Anticipated JORC Resource upgrade and increase to be delivered from the ongoing Resource Expansion Program, and increased project area (refer ASX announcements 17 January 2022, 2 February 2022, 28 March 2022, 23 May 2022 and 1 June 2022);
  • Higher lithium recoveries achieved from Anson’s Direct Lithium Extraction (“DLE”) test work; 91.5% recoveries against previously estimated 80% (refer ASX announcement 13 August 2021);
  • In excess of 1,000% increase in the Lithium Carbonate price over the past 24 months driven by forecast demand growth, stemming from the global electric vehicle revolution (see Figure 1 below);


  • Rapid expansion in private sector investment in lithium-ion battery manufacturing facilities in the United States (see Figure 2 below) and increased offtake activity for sustainably produced Lithium Carbonate;
  • The superior performance of Anson’s 99.95% purity Lithium Carbonate relative to commercially available battery-grade Lithium Carbonate in lithium-ion battery cells, indicating a longer battery lifespan (refer ASX announcement 9 September 2021);
  • The designation by the US Government of lithium as a critical mineral, with domestic production being in the national interest; and
  • The allocation of approximately US$20 billion in low interest loans by the US Government to support the transition from fossil fuels to an alternative energy economy, including the development of a domestic lithium supply chain.

Click here for the full ASX Release

This article includes content from Anson Resources Limited , licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.
ASN:AU
The Conversation (0)
  Diatreme Resources Limited

Mineral Resource Upgrade Paves Way for Northern Silica Project PFS

Emerging silica sands developer, Diatreme Resources Limited (ASX:DRX) announced today a significant upgrade to the estimated Si2 Mineral Resource at the Company’s Northern Silica Project (NSP) in Far North Queensland, highlighting the critical mineral project’s potential amid an accelerating solar energy boom.

Keep reading...Show less
Conquest Resources Enters into Agreement with VerAI Discoveries for AI Targeting on Belfast TeckMag Project

Conquest Resources Enters into Agreement with VerAI Discoveries for AI Targeting on Belfast TeckMag Project

Conquest Resources Limited (TSXV: CQR) ("Conquest" or the "Company") has entered into a Royalty Purchase and Sale Agreement with VDI Resources LLC (VDI), a subsidiary of VerAI Discoveries Inc. (VerAI), an artificial intelligence (AI) powered mineral discovery generator, pursuant to which the Company agrees to grant to VDI a 1.5% net smelter return royalty on certain target areas with recommended drilling locations generated by VerAI utilizing its proprietary AI technology. The Company agrees to grant VDI an additional 1.5% NSR in return for funding a drill program for testing of the targets identified by VerAI on the Belfast TeckMag Project, a 350 sq. km. land package located northeast of Sudbury, Ontario.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
SOURCE ROCK ROYALTIES ANNOUNCES INCREASED MONTHLY DIVIDEND

SOURCE ROCK ROYALTIES ANNOUNCES INCREASED MONTHLY DIVIDEND

/Not for distribution to U.S. news wire services or dissemination in the U.S./

Source Rock Royalties Ltd. ("Source Rock") (TSXV: SRR), a pure-play oil and gas royalty company with an established portfolio of oil royalties, announces that its board of directors has declared a monthly dividend of $0.0065 per common share, payable in cash on May 15, 2024 to shareholders of record on April 30, 2024 . This represents an increase of 8% to the monthly dividend. Source Rock has now increased its monthly dividend by 30% since March 2023 .

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
  Rimfire Pacific Mining Limited

Compelling Cobalt Copper and REE Targets Identified at Broken Hill

Rimfire Pacific Mining (ASX: RIM, “Rimfire” or “the Company”) is pleased to advise that multiple cobalt, copper, and Rare Earth Element [REE] targets have been identified at its recently expanded 100% - owned Broken Hill Project which is located 17-30 kilometres west of Broken Hill, NSW (Figures 1 and 2).

Keep reading...Show less
Reach Resources

Rights Issue and Shortfall

Reach Resources Limited (ASX: RR1 & RR1O) (“Reach” or “the Company”) is pleased to announce it has received $822,595 from the recently completed non-renounceable rights issue.

Keep reading...Show less
Various commodities atop a stock chart.

McKinsey: Commodities Trading Generated US$104 Billion in 2023

A recent report from McKinsey highlights trends seen in commodities trading over the past year.

The document shows that despite global uncertainty, commodities trading generated over US$100 billion in earnings before interest and taxes in 2023, translating into more than US$150 billion in gross margin.

McKinsey mentions challenges related to COVID-19 and geopolitical conflicts, such as increased price volatility and supply chain disruptions, but notes that commodities trading value pools have show resilience.

Keep reading...Show less

Latest Press Releases

Related News

×