Pilbara Minerals on Track for First Spodumene Concentrate Shipment

Pilbara Minerals (ASX:PLS) announced that it is on track to make the first shipment of spodumene concentrate from its Pilgangoora lithium-tantalum project this month. 

Pilbara Minerals (ASX:PLS) announced that it is on track to make the first shipment of spodumene concentrate from its Pilgangoora lithium-tantalum project this month.

As quoted in the press release:

The Company is on track to deliver a minimum of 5,000 tonnes of spodumene concentrate ready for ship-loading in Port Hedland from approximately 20 September, with the focus now on growing production and stockpiling concentrate (both on site and in Port Hedland) for subsequent shipments to Pilbara Minerals’ premier customer group.

As part of ongoing product testing with one of its key off-take partners, General Lithium, Pilbara Mineral’s spodumene concentrate has been tested at their research laboratory in China (aligned to their conversion process) and readily produced Battery Grade lithium carbonate. The final product in the test (which is representative of the proportion of both coarse and fines spodumene production at the Pilgangoora project) has been qualified and passed the relevant industry standard.

Ken Brinsden, managing director of Pilbara, commented:

We have some fantastic talent at Pilbara Minerals and with the production results and product quality we are achieving, it is clearly on display. From the significant orebody knowledge underwriting the Ore Reserve in the ground, to mining, blending and now plant performance we have always been focused on quality outcomes.

The strong results now being achieved also reflect the significant investments we made, including our decision to invest upfront in both a coarse and fines processing circuit, as well as in high-quality equipment selection. Together this will help ensure that the Pilgangoora Project becomes one of the lowest cost producers globally in the long term.

Click here to read the full Pilbara Minerals (ASX:PLS) press release.

Rio Tinto reaches agreement with Turquoise Hill Resources on financing plan for Oyu Tolgoi

Rio Tinto has entered into a binding Heads of Agreement (HoA) with Turquoise Hill Resources (TRQ) for an updated funding plan (the “Funding Plan”) for the completion of the Oyu Tolgoi (OT) Underground Project in Mongolia. The Funding Plan addresses the estimated remaining known funding requirement of approximately $2.3 billion 1 , building on and replacing the arrangements established in the Memorandum of Understanding that Rio Tinto and TRQ previously entered into on 9 September, 2020.

Under the HoA, subject to securing approval by OT LLC and any required support from the Government of Mongolia, and subject to timing, availability, and terms and conditions being acceptable to both parties, Rio Tinto and TRQ will:

Keep reading... Show less

Rio Tinto Exploration and Calibre Mining Initiate 2021 Exploration Program Including 5,500 Metre Drilling Campaign Prioritizing Prospective Near-Surface Copper and Copper-Gold Mineralization

Calibre Mining Corp. (TSX: CXB; OTCQX: CXBMF) (the “Company” or “Calibre”) is pleased to provide an update on the Borosi exploration project held under an earn-in option agreement between Rio Tinto Exploration (LSE:RIO) (“RTX”) (“Rio Tinto”) and Calibre. Calibre controls a 100% interest in the Borosi concessions located in the prolific Mining Triangle region of northeastern Nicaragua. RTX has the right to earn a 75% interest by spending US$45 million over eleven years in the project ( see Calibre news release dated February 24, 2020 ). The Borosi exploration program is being directed by RTX through a partnership agreement with Calibre as project operator.

Highlights

Keep reading... Show less

FDA Approves Trodelvy®, the First Treatment for Metastatic Triple-Negative Breast Cancer Shown to Improve Progression-Free Survival and Overall Survival

Trodelvy Significantly Reduced the Risk of Death by 49% Compared with Single-Agent Chemotherapy in the Phase 3 ASCENT Study –

– Trodelvy is Under Regulatory Review in the EU and in the United Kingdom, Canada, Switzerland and Australia as Part of Project Orbis

Keep reading... Show less

Rio Tinto details $47 billion 2020 economic contribution, including $8.4 billion of taxes and royalties

Rio Tinto today released its 2020 Taxes paid: Our economic contribution report , which shows the company made a total direct economic contribution of $47 billion in the countries and communities where it operates, including $8.4 billion of taxes and royalties.

Despite the widespread challenges of COVID-19 in 2020, the contribution was up from the previous year, when Rio Tinto made a total direct economic contribution of $45.1 billion in the countries and communities where it operates, including $7.6 billion of taxes and royalties.

Keep reading... Show less

Top News

Related News