Rio Tinto releases first quarter production results

Rio Tinto Chief Executive Jakob Stausholm said: “We achieved an overall solid operating performance in the first quarter. We have maintained guidance ranges in all our products, with site teams successfully managing the effects of significant rainfall, in particular at our Australian iron ore assets. “It has been a period of deep reflection for the company, and I have personally spent a significant amount of time …

Rio Tinto Chief Executive Jakob Stausholm said: “We achieved an overall solid operating performance in the first quarter. We have maintained guidance ranges in all our products, with site teams successfully managing the effects of significant rainfall, in particular at our Australian iron ore assets.

“It has been a period of deep reflection for the company, and I have personally spent a significant amount of time listening, learning and taking actions, in particular to better manage Traditional Owner partnerships and cultural heritage. I have appointed a new leadership team and the transition is progressing well. We have set out clear priorities to develop a stronger Rio Tinto. Our focus is to become the best operator, strive for impeccable ESG credentials, excel in development and secure a strong social licence. This ambition will enable us to continue to deliver superior returns to shareholders, invest in sustaining and growing our portfolio, and make a broader contribution to society.”

Production*

Quarter 1
2021

vs Q1
2020

vs Q4
2020

Pilbara iron ore shipments (100% basis) (Mt)

77.8

+7%

-12%

Pilbara iron ore production (100% basis) (Mt)

76.4

-2%

-11%

Bauxite (Mt)

13.6

-2%

+2%

Aluminium (kt)

803

+3%

-1%

Mined Copper (kt)

120.5

-9%

-9%

Titanium dioxide slag (kt)

279

-5%

+3%

IOC iron ore pellets & concentrate (Mt)

2.3

-8%

-14%

*Rio Tinto share unless otherwise stated

Q1 Operational update

  • Health, safety and well-being remains our top priority. Our all injury frequency rate (AIFR) of 0.35 improved versus the first quarter of 2020 (0.40). However, we recognise there is no room for complacency and continue to focus on providing strong support for our employees, contractors and host communities, while maintaining critical COVID-19 controls.
  • Pilbara iron ore shipments of 77.8 million tonnes (100% basis) were 7% higher than the first quarter of 2020. Production of 76.4 million tonnes (100% basis) was 2% lower, driven by above average wet weather in the mines through February and fixed plant reliability. Labour resource availability and weather challenges disrupted maintenance. Tropical Cyclone Seroja impacted mine and port operations in April. Full year iron ore guidance remains unchanged.
  • Bauxite production of 13.6 million tonnes was 2% lower than the first quarter of 2020 due to wet weather in Eastern Australia. The port at the Amrun mine closed for 14 days due to large swells and cyclones. Full year bauxite guidance remains unchanged.
  • Aluminium production of 0.8 million tonnes was 3% higher than the first quarter of 2020, with the Becancour smelter, Quebec operating at full capacity and Kitimat, British Columbia nearing the end of its pot relining cycle.
  • Mined copper production of 120.5 thousand tonnes was 9% lower than 2020, with lower recoveries and throughput at Escondida and Kennecott partly offset by the anticipated higher grade from the Oyu Tolgoi open pit. Kennecott saw a marginal increase in head grade as it begins the transition into higher grades from the south wall ore, with grades expected to gradually increase through 2021. Oyu Tolgoi shipments have been affected by Chinese border restrictions due to increased cases of COVID-19 in Mongolia. We continue to work closely with authorities and our customers to manage the risk of supply chain disruptions.
  • Titanium dioxide slag production of 279 thousand tonnes was 5% lower than 2020 due to a planned furnace rebuild at the Rio Tinto Fer et Titane (RTFT) metallurgical complex in Quebec resulting in operation of 8 out of 9 furnaces.
  • Production of pellets and concentrate at Iron Ore Company of Canada (IOC) was 8% lower than 2020 due to the impacts of weather, loading unit availability on mine feed and reduced concentrator mill availability. There was a fire at one of the two reclaimers at the port on 31 March. Full year production guidance remains unchanged.
  • On 8 April, we released Taxes Paid: Our Economic Contribution 2020, showing that we made a total direct economic contribution of $47 billion in the countries and communities where we operate, including $8.4 billion of taxes and royalties.
  • As part of our Climate Strategy, in the first quarter of this year, we entered into two partnerships to progress our work to decarbonise our value chain. Together with Paul Wurth S.A. and SHS-Stahl-Holding-Saar GmbH & Co., we are exploring the viability of transforming iron ore pellets into low-carbon hot briquetted iron, a low-carbon steel feedstock, using green hydrogen generated from hydro-electricity in Canada. At our Boron site in California, we are exploring the deployment of Heliogen’s breakthrough solar technology which will use heat from the sun to generate and store carbon-free energy to power the mine’s industrial processes. Further details in the Climate change and our value chain section.

The full first quarter production results are available here

This announcement is authorised for release to the market by Rio Tinto’s Group Company Secretary.

LEI: 213800YOEO5OQ72G2R82

Classification: 3.1 Additional regulated information required to be disclosed under the laws of a Member State

media.enquiries@riotinto.com
riotinto.com

Media Relations, United Kingdom
Illtud Harri
M +44 7920 503 600

David Outhwaite
M +44 7787 597 493

Media Relations, Americas
Matthew Klar
T +1 514 608 4429

Media Relations, Asia
Grant Donald
M +65 9722 6028

Media Relations, Australia
Jonathan Rose
M +61 447 028 913

Matt Chambers
M +61 433 525 739

Jesse Riseborough
M +61 436 653 412

Investor Relations, United Kingdom
Menno Sanderse
M: +44 7825 195 178

David Ovington
M +44 7920 010 978

Clare Peever
M: +44 7788 967 877

Investor Relations, Australia
Natalie Worley
M +61 409 210 462

Amar Jambaa
M +61 4 7286 5948

Rio Tinto plc
6 St James’s Square
London SW1Y 4AD
United Kingdom
T +44 20 7781 2000
Registered in England
No. 719885

Rio Tinto Limited
Level 7, 360 Collins Street
Melbourne 3000
Australia
T +61 3 9283 3333
Registered in Australia
ABN 96 004 458 404

Category: General

News Provided by Business Wire via QuoteMedia

Hastings Technology Metals Ltd Measured and Indicated Mineral Resource Tonnes Up by 54%

Perth, Australia (ABN Newswire) – Australia’s next rare earths producer, Hastings Technology Metals Ltd (ASX:HAS) (FRA:5AM), is pleased to announce a material increase in Mineral Resource Estimate at its Yangibana Rare Earths Project (Yangibana) in Western Australia’s Gascoyne region.

Highlights

– Measured and Indicated Mineral Resource tonnes increased by 54% to 16.3Mt for Yangibana deposits drilled during 2020.

Keep reading... Show less

ASI certifies Rio Tinto’s ISAL smelter for responsible production

Rio Tinto’s ISAL smelter in Iceland has been certified by the Aluminium Stewardship Initiative (ASI) for meeting the highest internationally recognised standards for responsible aluminium production.

The certification continues Rio Tinto’s leadership of the industry on responsible aluminium production from mine to metal, and means customers can be assured aluminium produced at ISAL meets independent environmental, social and governance standards.

Keep reading... Show less

Rio Tinto updates details of tailings facilities

Rio Tinto today released updated information in relation to its global tailings facilities to align with the requirements of the Global Industry Standard for Tailings Management (GISTM) released in August 2020, an initiative co-convened by the International Council on Mining and Metals, United Nations Environment Programme and the Principles for Responsible Investment.

The latest disclosure at http://www.riotinto.com/tailings builds on previously disclosed information on each of Rio Tinto’s global tailings facilities released in June 2019 and the publication of Rio Tinto’s Group Procedure and updated Standard for ‘Management of tailings and water storage facilities’ in February 2019. The changes to existing data are in line with guidance contained in GISTM including updating information previously disclosed.

Keep reading... Show less

Hastings Technology Metals Ltd Quarterly Activities Report

Perth, Australia (ABN Newswire) – Australia’s next rare earths producer, Hastings Technology Metals Ltd (ASX:HAS) (FRA:5AM) is pleased to report on exploration and development activities for the three-month period to 31st March 2021. Most of the activity focused on the Company’s Yangibana Rare Earths Project (“Yangibana”) in the Gascoyne region of Western Australia.

Highlights

– Hastings raised $100.7 million (before costs) through a two-tranche equity placement priced at $0.19 per share, with funds to be used to advance development of the Yangibana Rare Earths Project.

Keep reading... Show less

Argyle Diamond Mine Closure: What’s Next for the Sector in Australia?

Click here to read part one of this article, which covers the closure of the Argyle diamond mine.

When the mining equipment permanently shut down at Western Australia's Argyle mine in November 2020, the country's diamond sector entered a transitional period.

As the world's fourth largest diamond-producing asset shuttered, domestic output of the gems instantly declined by as much as 90 percent.

Keep reading... Show less

Top News

Related News