Runaway Train Derails BHP Iron Ore Shipments

Runaway Train Derails BHP Iron Ore Shipments

BHP intentionally derailed an iron ore train in the Pilbara on Monday, severing connections between its mines and its shipping terminal at Port Hedland.

Australian iron miner BHP Billiton (ASX:BHP,NYSE:BHP,LSE:BLT) has an almighty mess on its hands, after it was forced to intentionally derail a 268-wagon train in the sparsely populated Pilbara of Western Australia on Monday (November 5).

The train had been travelling between Newman and Port Hedland, and made it to within 119 km of its major shipping terminal at speeds of up to 110 km per hour before it was derailed remotely from Perth.

It was fully-laden with iron ore from the company’s Pilbara iron ore operations, and travelled 92 km without anyone (human or robot) at the helm after the driver “alighted from the locomotive to inspect an issue with an ore car,” according to the Australian Transport Safety Bureau report.

“While the driver was outside of the locomotive, the train commenced to runaway.”

The derailment, which damaged 1.5 km of track and left a mangled pile of wagons and spilled ore, means that BHP’s Pilbara railway connecting its iron ore mines with its shipping terminal is severed.

With 130 workers being sent to clean up the mess and repair the rail, a company spokeswoman told the Australian Broadcasting Corporation that partial rail operations could resume in “about a week.”

Nobody was injured in the derailment.

The company has said it’s unable to calculate how much the derailment will cost in regards to overall repairs and disruptions to iron ore shipments, but it did say that stockpiles at Port Hedland were not enough to meet contractual obligations in the meantime. Most iron ore is shipped to China.

The derailment is a blemish on BHP’s iron ore operations, which are the backbone of the company. In its September quarter results released last month, the company had reported 62 million tonnes of iron ore mined with guidances for the year remaining the same — it had also highlighted “improved reliability across our rail network and port operations.”

Besides the calamity on the railway, all BHP iron ore operations in the Pilbara remain online.

The ATSB reports that its investigation into the incident is estimated to be completed by Q2 in 2019.

On the ASX, BHP was not adversely affected by the news, with the company’s share price slightly up on the day of the news, closing at AU$33.32. Today (November 7), it was trading at AU$33.32.

Don’t forget to follow us @INN_Resource for real-time updates!

Securities Disclosure: I, Scott Tibballs, hold no direct investment interest in any company mentioned in this article.

Tempus Closes A $1.9 Million Private Placement

Tempus Resources Ltd (“Tempus” or the “Company”) (ASX:TMR)(TSX.V:TMRR) is pleased to announce that it has closed the non-brokered private placement announced on 23 April 2021 (the “Placement

The Placement has been completed utilising the Company’s available capacity under ASX Listing Rules 7.1 and 7.1A. It includes two tranches: Tranche 1, which consists of 6,037,736 ordinary shares issued on 12 May, 2021, as “Canadian flow-through shares” at a price of C$0.155 (approximately A$0.163) per share for proceeds of approximately C$935,849; and Tranche 2, which consists of 6,065,425 ordinary shares issued on 30 April 2021 at a price of A$0.145 (approximately C$0.138) per share for proceeds of approximately A$879,487. The total proceeds from both Tranche 1 and Tranche 2 of the Placement are approximately A$1,866,149 (C$1,770,042). Following the completion of the Placement, the Company has 98,744,613 shares on issue.

Keep reading... Show less

Galaxy Resources Limited Announcement

Galaxy Resources Limited (ASX: GXY) ( Company ) advises that the following announcement has been made to the Australian Securities Exchange which appears on the Company’s platform (ASX):

  • Appendix 2A

The announcement can be viewed at:

Keep reading... Show less

Massive Sulfide Nickel Drilling Update

Blackstone Minerals Limited (“Blackstone" or the “Company") is pleased provide an exploration update on its flagship Ta Khoa Nickel-Cu-PGE project, for which assay results have been received from drilling at its Massive Sulfide Vein (MSV) prospects (refer Table 3, Table 4 & Appendix 1).

Keep reading... Show less

Novo Completes Malmsbury Option Exercise with GBM Resources Limited

Novo Resources Corp. (“ Novo ” or the “ Company ”) (TSX: NVO & NVO.WT; OTCQX: NSRPF) is pleased to advise that it has completed its option exercise to earn a 50% interest in the Malmsbury gold project (the “ Malmsbury Project ”) held by ASX-listed GBM Resources Limited (ASX: GBZ) (“ GBM ”) following the satisfaction of all conditions precedent, including receipt of Australian Foreign Investment Review Board approval (refer to the Company’s news releases dated March 30, 2020 September 24, 2020 and January 15, 2021 for further details).

“We are thrilled to complete our option exercise at Malmsbury,” commented Dr. Quinton Hennigh, Chairman and President of Novo. “We see Malmsbury as a Fosterville analogue given its similar position along the eastern margin of the prolific Bendigo Zone, epizonal orogenic setting and historic high-grade gold production. Our geologic team will pursue aggressive field work over the next few months with the goal of developing drill targets for testing later this year.”

Keep reading... Show less

Rare Earth Elements Demand is Still Growing

Rare Earth Elements are 17 silvery-white heavy metals with special magnetic capabilities. REEs have diverse applications and are commonly used in lasers, glass, superconductors, hard drives, wind turbine generators, and magnetic materials. Despite the name, REEs are abundant in the world, often found underground alongside uranium in sand structures called monazite. REEs concentrate must first be separated from the sand. Neodymium and praseodymium (NdPr) represent about 80% of the value of REE concentrate. Demand for these elements is growing because of their use in electric vehicles, wind turbines, and appliances. Adams Intelligence expects the demand for NdPr to double in the next five years. Removing REEs from monazite and then separating REEs into individual components is a complicated process. Read More >>

News Provided by Channelchek via QuoteMedia

Keep reading... Show less

Top News

Related News