Perth, Australia – Torian Resources Ltd is pleased to advise that recent drilling results continue to extend the Mt Stirling Gold System over ~1.1km of Strike, ~300m at depth, and it remains open in multiple directions. Highlights: – The interpreted strike of the Mt Stirling gold system exceeds 1.160km with Mt Stirling Main Zone; Hanging Wall and Viserion lodes all remaining open along strike and down-dip. – Assay …

Perth, Australia (ABN Newswire) – Torian Resources Ltd (ASX:TNR) is pleased to advise that recent drilling results continue to extend the Mt Stirling Gold System over ~1.1km of Strike, ~300m at depth, and it remains open in multiple directions.

Highlights:

– The interpreted strike of the Mt Stirling gold system exceeds 1.160km with Mt Stirling Main Zone; Hanging Wall and Viserion lodes all remaining open along strike and down-dip.

– Assay results and footprint continue to track on par and are consistent with regional significant discoveries, e.g. St Barbara’s (ASX:SBM) 4.8Moz Gwalia Mine and Saracen’s (ASX:SAR) 3.8Moz Thunderbox Mine, with the Mt Stirling Gold System remaining open in all directions.

– Torian awaiting results from 3 drill holes to be incorporated to the interim Resource Estimate; in addition to 11 SE Phase 2 drill holes; 16 holes at Stirling Well and 19 holes from Diorite, with results forthcoming.

– Mt Stirling Regional targeting has identified numerous Priority 1 and Priority 2 targets along four key structural corridors; Viserion Shear (3.4km); Wonambi Shear (2.2km); Ursus Fault (2.5km) and Blue Jacket (2.2km) for immediate follow-up exploration including AV drilling.

– Torian is now fully funded to conduct its 50,000m drilling campaign in 2021.

Torian’s Executive Director Mr Peretz Schapiro said “Cracking 1km of Strike at Mt Stirling represents a significant milestone for our company. With each batch of results received, it becomes clearer and clearer to us that we’re sitting on something quite substantial at Mt Stirling. We have demonstrated that we are ‘on the system’, with our immediate task being to define the actual footprint of Mt Stirling, as it continues to remain open along strike and depth.

Should results confirm our interpretation of a shear-hosted gold system that continues at depth, for considerable down-dip depth, it would mean that Mt Stirling’s multiple gold structures continue to have the potential to depth and resemble that of regional operating gold mines e.g St Barbara’s (ASX:SBM) 4.8Moz Gwalia Mine and Saracen’s (ASX:SAR) 3.8Moz Thunderbox Mine, given it remains open in all directions.

Whilst we were frustrated at having to delay the resource update, in hindsight it is clear that we made the correct decision to delay, as the estimate will now include this set of excellent results. Had we opted to not delay the resource estimate update, these assays would not have been included.

Results received continue to fill us with confidence that when our interim resource estimate is completed later this month, it will result in a significant update to our tonnage and gold ounces at Mt Stirling. The interim resource will provide the Company with strong fundamental backing as we continue our journey to develop Mt Stirling into a Gold Camp.

In addition to attempting to prove up a larger footprint at Mt Stirling itself, we will soon be actively following up with other high priority targets in the region. For instance, there have been historical gold intercepts 1.2km NW and along strike from Mt Stirling. We are excited about a potential connection between Mt Stirling Well and Mt Stirling. We will be following up on the Blue Jacket prospect to the east, which has historical gold intercepts alongside some deep historical shafts, in addition to following up on the newly discovered eastern zone at Mt Stirling and the prolific Ursus fault (Figure 11*). We are also looking forward to follow up work on Diorite, particularly around the high grade historical mines and soil and rock chip anomalies.

2021 is shaping up to be an exciting year for our Company as we anticipate significant news flow over the coming weeks and months. We eagerly await the remaining results from Mt Stirling, some of which will feed into our resource upgrade, in addition to the results from 18 drillholes at Stirling Well, 19 exploratory drill holes at Diorite and the continued exploration of our Mt Stirling and Diorite projects.

*To view tables and figures, please visit:
https://abnnewswire.net/lnk/Y938EB21

About Torian Resources Limited:

Torian Resources Ltd (ASX:TNR) is a gold exploration and development company with an extensive and strategic land holding comprising eight projects and over 400km2 of tenure in the Goldfields Region of Western Australia.

Torian’s flagship project, Zuleika, is located along the world-class Zuleika Shear. The Zuleika Shear is the fourth largest gold producing region in Australia and consistently produces some of the country’s highest grade and lowest cost gold mines. Torian’s Zuleika project lies north and partly along strike of several major gold deposits including Northern Star’s (ASX:NST) 7.0Moz East Kundana Joint Venture and Evolutions (ASX:EVN) 1.8Moz Frogs Legs and White Foil deposits.

Torian’s other projects include the strategically located Mt Stirling and Malcolm Projects in the Leonora region (near Red 5’s King of the Hills Project), where it recently completed updated Mineral Resource Estimates and preliminary scoping studies, and a suite of other projects in the Kalgoorlie region including Credo Well JV Zuleika JV, Bonnie Vale, Gibraltar and Mount Monger/Wombola.

Source:
Torian Resources Limited

Contact:
Peretz Schapiro
Executive-Director
info@torianresources.com.au

News Provided by ABN Newswire via QuoteMedia

Hastings Technology Metals Ltd Onslow Selected for Yangibana RE Hydrometallurgical Plant

Perth, Australia (ABN Newswire) – Australia’s next rare earths producer, Hastings Technology Metals Ltd (ASX:HAS) (FRA:5AM) is pleased to announce that it has received conditional approval from the WA Government to develop the Yangibana Rare Earths Project’s (Yangibana) hydrometallurgical plant in the Ashburton North Strategic Industrial Area (ANSIA), near Onslow on the Pilbara coast.

ANSIA is home to Chevron’s Wheatstone and BHP’s Macedon gas projects and offers Hastings access to key utilities as well as proximity to a skilled workforce in Onslow and the town’s port and airport facilities.

The ANSIA location has access to key connections services required for rare earths processing, such as piped natural gas, sufficient water and power, which are all located within close proximity of the proposed Yangibana hydrometallurgical location.

Keep reading... Show less

Lake Resources NL Quarterly Activities Report

Sydney, Australia (ABN Newswire) – Lake Resources NL (ASX:LKE) (FRA:LK1) (OTCMKTS:LLKKF) is a lithium developer utilising clean, direct extraction technology for the development of high purity lithium products with significant ESG benefits from its flagship Kachi Project (4.4mt LCE resource), and three other lithium brine projects in Argentina. No mining is involved in the brine processing.

Lake owns over 220,000 hectares (0.5 million acres) of leases in a prime location within the Lithium Triangle, alongside all 5 major lithium producers.

A key difference in Lake’s development plan to lithium production is to use an efficient direct lithium extraction method (DLE) from our technology partner, Lilac Solutions Inc. This enables Lake Resources to be a cost competitive supplier of high-purity lithium carbonate with a low carbon (CO2) footprint, low water use and low land use – strong Environmental, Social, Governance (ESG) benefits.

Keep reading... Show less

OceanaGold Reports Second Quarter 2021 Financial Results

/NOT FOR DISSEMINATION OR DISTRIBUTION IN THE UNITED STATES AND NOT FOR DISTRIBUTION TO US NEWSWIRE SERVICES./

(All financial figures in US Dollars unless otherwise stated)

Keep reading... Show less

In exceptional market conditions, Rio Tinto achieves record financial results and declares total interim dividend of 561 US cents per share, 75% of underlying earnings

Rio Tinto Chief Executive Jakob Stausholm said “Government stimulus in response to ongoing COVID-19 pressures has driven strong demand for our products at a time of constrained supply resulting in a significant spike in most prices. We focused on safely running our world-class assets and supplying products to our customers. This enabled us, despite operational challenges, to deliver record financial results with free cash flow of $10.2 billion and underlying earnings of $12.2 billion, after taxes and government royalties of $7.3 billion. We are further strengthening the portfolio with our commitment to fund the high-quality Jadar lithium project, which signals our large-scale entry into the fast-growing battery materials market. We will pay an interim dividend of 561 US cents per share, representing 75% of underlying earnings.

“We are making progress on our four priorities, identifying opportunities for operational improvement, advancing our ESG agenda, taking important investment decisions and stepping up our external engagement. We are making real and lasting changes to the way we engage, interact and operate and are committed to ensuring that we have strong and positive relationships wherever we do business. We have identified what we need to do to make Rio Tinto a better company for the long term, with the right teams in place to unleash our full potential.”

Keep reading... Show less

Lake Resources NL Bonus Issue to Shareholders

Sydney, Australia (ABN Newswire) – Clean lithium developer Lake Resources NL (ASX:LKE) (FRA:LK1) (OTCMKTS:LLKKF), in recognition of the support received from its shareholders, wishes to advise that it intends to undertake a bonus issue of options (Bonus Options) to all shareholders with an address in Australia or New Zealand (Eligible Shareholders) at 5:00 pm (Sydney time) on the Record Date (set out in the indicative timetable set out below*).

As the Bonus Options will be issued for nil consideration, Lake is raising no capital from their issue. For every ten (10) shares held at 5:00 pm (Sydney time) on the Record Date, Eligible Shareholders will be issued with one (1) free Bonus Option.

The Bonus Options will have an exercise price $0.35 each, expiring on 15 October 2021 and, if exercised, each will result in the allotment and issue of one (1) fully paid ordinary share in Lake. Lake will not seek listing of the Bonus Options on ASX.

Keep reading... Show less

Hastings Technology Metals Ltd Onslow Selected for Yangibana RE Hydrometallurgical Plant

Perth, Australia (ABN Newswire) – Australia’s next rare earths producer, Hastings Technology Metals Ltd (ASX:HAS) (FRA:5AM) is pleased to announce that it has received conditional approval from the WA Government to develop the Yangibana Rare Earths Project’s (Yangibana) hydrometallurgical plant in the Ashburton North Strategic Industrial Area (ANSIA), near Onslow on the Pilbara coast.

ANSIA is home to Chevron’s Wheatstone and BHP’s Macedon gas projects and offers Hastings access to key utilities as well as proximity to a skilled workforce in Onslow and the town’s port and airport facilities.

The ANSIA location has access to key connections services required for rare earths processing, such as piped natural gas, sufficient water and power, which are all located within close proximity of the proposed Yangibana hydrometallurgical location.

Keep reading... Show less

Lake Resources NL Quarterly Activities Report

Sydney, Australia (ABN Newswire) – Lake Resources NL (ASX:LKE) (FRA:LK1) (OTCMKTS:LLKKF) is a lithium developer utilising clean, direct extraction technology for the development of high purity lithium products with significant ESG benefits from its flagship Kachi Project (4.4mt LCE resource), and three other lithium brine projects in Argentina. No mining is involved in the brine processing.

Lake owns over 220,000 hectares (0.5 million acres) of leases in a prime location within the Lithium Triangle, alongside all 5 major lithium producers.

A key difference in Lake’s development plan to lithium production is to use an efficient direct lithium extraction method (DLE) from our technology partner, Lilac Solutions Inc. This enables Lake Resources to be a cost competitive supplier of high-purity lithium carbonate with a low carbon (CO2) footprint, low water use and low land use – strong Environmental, Social, Governance (ESG) benefits.

Keep reading... Show less

OceanaGold Reports Second Quarter 2021 Financial Results

/NOT FOR DISSEMINATION OR DISTRIBUTION IN THE UNITED STATES AND NOT FOR DISTRIBUTION TO US NEWSWIRE SERVICES./

(All financial figures in US Dollars unless otherwise stated)

Keep reading... Show less

In exceptional market conditions, Rio Tinto achieves record financial results and declares total interim dividend of 561 US cents per share, 75% of underlying earnings

Rio Tinto Chief Executive Jakob Stausholm said “Government stimulus in response to ongoing COVID-19 pressures has driven strong demand for our products at a time of constrained supply resulting in a significant spike in most prices. We focused on safely running our world-class assets and supplying products to our customers. This enabled us, despite operational challenges, to deliver record financial results with free cash flow of $10.2 billion and underlying earnings of $12.2 billion, after taxes and government royalties of $7.3 billion. We are further strengthening the portfolio with our commitment to fund the high-quality Jadar lithium project, which signals our large-scale entry into the fast-growing battery materials market. We will pay an interim dividend of 561 US cents per share, representing 75% of underlying earnings.

“We are making progress on our four priorities, identifying opportunities for operational improvement, advancing our ESG agenda, taking important investment decisions and stepping up our external engagement. We are making real and lasting changes to the way we engage, interact and operate and are committed to ensuring that we have strong and positive relationships wherever we do business. We have identified what we need to do to make Rio Tinto a better company for the long term, with the right teams in place to unleash our full potential.”

Keep reading... Show less

Lake Resources NL Bonus Issue to Shareholders

Sydney, Australia (ABN Newswire) – Clean lithium developer Lake Resources NL (ASX:LKE) (FRA:LK1) (OTCMKTS:LLKKF), in recognition of the support received from its shareholders, wishes to advise that it intends to undertake a bonus issue of options (Bonus Options) to all shareholders with an address in Australia or New Zealand (Eligible Shareholders) at 5:00 pm (Sydney time) on the Record Date (set out in the indicative timetable set out below*).

As the Bonus Options will be issued for nil consideration, Lake is raising no capital from their issue. For every ten (10) shares held at 5:00 pm (Sydney time) on the Record Date, Eligible Shareholders will be issued with one (1) free Bonus Option.

The Bonus Options will have an exercise price $0.35 each, expiring on 15 October 2021 and, if exercised, each will result in the allotment and issue of one (1) fully paid ordinary share in Lake. Lake will not seek listing of the Bonus Options on ASX.

Keep reading... Show less

Lake Resources NL Argentina based Director Strengthens Board

Sydney, Australia (ABN Newswire) – Clean lithium developer Lake Resources NL (ASX:LKE) (FRA:LK1) (OTCMKTS:LLKKF) has strengthened its Board, announcing today the appointment of experienced energy/natural resources lawyer, Sra. Amalia Saenz as a Non-Executive Director.

Based in Buenos Aires, Sra. Amalia’s appointment will assist Lake and its local team in Argentina in engaging with local stakeholders and preparing for the development of clean lithium production in Argentina.

Sra. Saenz is a partner at the law firm, Zang, Bergel & Viaes in Buenos Aires, where she leads the firm’s energy and natural resources practice.

Keep reading... Show less

Top News

Related News