See our exclusive index of companies on the move:
Explore Stocks- Top Stocks
- Top Australian Gold Stocks
- Top ASX Copper Stocks
- Top ASX Nickel Stocks
- Top ASX Rare Earth Stocks
- Top Battery Metals Stocks on the ASX
- Top Australian Lithium Stocks
- Top Graphite Miners on the ASX
- 10 ASX Cannabis Stocks
- Top ASX Tech Stocks
- Top AI Stocks on the ASX
- On Site
- About Australian Cannabis Investing
- About Australian Resource Investing
- About Australian Tech Investing
- About Australia Investing
- Of Interest
- ASEAN-Australia-New Zealand Trade Agreement
- Association of Southeast Asian Nations (ASEAN)
- Australian FAQ on ASEAN
- Australia Government on Foreign Investments
Vendetta Reports Near-Surface High-Grade Results from Pegmont
The initial 2018 drill program included a total of 32 holes and one hole from 2017 was extended, for a total of 4670 m.
Vendetta Mining (TSXV:VTT) has announced the first batch of drill results from the 2018 resource development program on the Pegmont lead-zinc project in Queensland, Australia and a private placement of $1.5 million.
The initial 2018 drill program included a total of 32 holes and one hole from 2017 was extended, for a total of 4670 m. An important component of that program included the drilling of 12 diamond holes in an area that is being considered as the initial site for open pit development at Pegmont.
Zone 1 highlights:
- PVRD176: 5.38 metres of 10.94 percent lead-zinc (6.98 percent lead, 3.96 percent zinc;
- PVD181: 5.98 metres of 11.29 percent lead-zinc (7.21 percent lead, 4.09 percent zinc);
- PVD182: 9.32 metres of 12.50 percent lead-zinc (10.46 percent lead, 2.04 percent zinc);
- PVD183: 5.80 metres of 16.35 percent lead-zinc (10.17 percent lead, 6.18 percent zinc); and
- PVD184: 4.55 metres of 13.25 percent lead-zinc (9.85 percent lead, 3.40 percent zinc);
Director and project manager at Pegmont, Peter Voulgaris said:
“As part of the advanced planning for the preliminary economic assessment the company had been considering start-up pit locations suitable for in-pit tails disposal, the planned locations offer significant advantages to the project including a simplified permitting process, the capital savings of not needing to build a tails dam storage facility, and limiting the projects footprint. While these drill results will not be incorporated into the PEA, they and the metallurgical results that will follow are a significant step in de-risking the start-up period at Pegmont.”
Click here to read the full Vendetta Mining (TSXV:VTT) press release.
Top News
FEATURED STOCKS
Investing News Network websites or approved third-party tools use cookies. Please refer to the cookie policy for collected data, privacy and GDPR compliance. By continuing to browse the site, you agree to our use of cookies.